Considering PT. Anggrek Hitam’s optimal and ideal location, the shipyard benefits from:

Location

— Access to numerous international suppliers (i.e. Caterpillar, Berg, Kongsberg, Baudoin, Leroy-Somer, etc.)

— Network with Qualified Specialists (i.e. Mentrade, Westingeneral, etc.)

— Efficient and expedited international deliveries credible to the Port of Singapore, along with transportation of 2 voyages, and 2 air-freights per day

— Free-trade-zone (FTZ) ensuring simplified and economical import and export environment

— Infrastructure that allows reliable power supply from PLN

— Access to an abundance of specialist sub-contractors

 

Layout

  • Optimized Steel Workflow
  • Pre-fabrication Area
  • Water Frontage: Efficient drainage, and ease of launching

 

FACILITY DETAILS

 

Steel Workshop                       
  • Covered Workshop space
  • Open steel storage
  • Overhead cranes
  • Plasma CNC
  • Steel blasting & painting line
  • Hydraulic bending machine
  • 1,875 m2
  • 1,200m2
  • 2x Cap. 10 T
  • 2x Cap. 40 T /day
  • Cap. 40 plates /day
  • Cap. 300T

workshopAH Facility1

Power Plant
  • Emergency Diesel Generator
  • Main Switchboard
  • Air-compressed network
  • one x 200 KW

20150417_150024

Maintenance & Mechanical Workshop
  • Covered workshop surface
  • Overhead cranes
  • Air-compressed network
  • 2x 625 m2
  • 2x Cap. 3 T

20150417_145948

Piping & Electrical Workshop
  • Covered workshop surface
  • Air-compressed network
  • 2x 625 m2

20150417_150149

Store
  • Covered storage surface
  • Open storage surface
  • Electric Stacker
  • Forklift
  • Fuel storage
  • 625 m2
  • 625 m2
  • one x Cap. 5 T
  • one x Cap. 10 T
  • 10,000 L

warehouse

Office
  • Main Office
  • Site Office
  • 800 m2
  • 300 m2

 DSC_2088DSC_2076

Pre-fabrication area
  • Pre-fabrication surface
  • Fire Fighting
  • Fire fighting network with 12 hydrants
  • 28,000 m2

steel cutting2

Construction Area
  • Construction berths
  • Fire Fighting
  • Fire fighting network with 12 hydrants
  • Compressed air network with 6 connection points
  • 4x (135 x 42 m)

AH Facility3.jpg DSC_2062

Jetty Area
  • Jetty
  • Jetty Pre-fabrication area
  • 65m x 78m reinforced at 50T/m2
  • 3,000m2 covered with reinforced concrete at 10T/m2

jetty

Mobile Equipment (Handling)
  • Mobile Crane 100 T
  • Mobile Crane 70 T
  • Mobile Crane 40 T
  • Wheel-loader 5T
  • 2x XCMG 100T
  • 2x XCMG 70T
  • 1x XCMG 40T
  • 2x XCMG 5T

mobile equipment mobile equipment 4 mobile equipment 3

Welding Equipment
  • Manual Welding Units
  • Semi-Automatic Welding Units
  • Automatic Welding Units
  • Piping and Welding Units
  • 230
  • 75
  • 10
  • 4

20150417_150024 welding example2

Design Development Software
  • FORAN Engineering Software
  • Advanced technology providing 3D Production drawings
  • 3D modeling with single database that provides minimal clash
  • Nesting sketch that incorporates Nesting code
  • Bending template information presentation
  • Detailed assembly drawing equipped with BOM and Part List for arrangement to perfection
  • Pre-fabrication to assembly details and drawings

forancombinedforan2